Zahner
  • Materials
  • Products & Systems
  • Custom Solutions
        • A Successful Start

          Design Assist

          Collaboration from concept to completion.

          Learn More
        • Unique Solutions

          Engineering

          Innovative problem-solving for projects of all sizes.

          Learn More
        • Custom Manufacturing

          Fabrication

          From robotic precision to sustainable materials.

          Learn More
        • Concept Realization

          Installation

          Delivering exceptional quality in the field.

          Learn More
        • Design Assist

          Design Assist
        • Engineering

          Engineering
        • Fabrication

          Fabrication
        • Installation

          Installation
  • Projects
        • Completed Work

          All Projects

          A selection of our favorite collaborations.

          View Projects
        • Our Work, By Typology

          Applications

          From complete facades to column covers, find inspiration for your next project.

          Explore Applications
        • Expert Manufacturing

          Capabilities

          Embossing, selective polishing, undulated metal, and more.

          See Capabilities
        • All Projects

          All Projects
        • Applications

          Applications
        • Capabilities

          Capabilities
  • Innovation
        • Zahner Labs

          R&D

          See what Zahner is doing to evolve the architectural metals solution space.

          Learn More
        • Responsible Stewardship

          Sustainability

          Zahner is committed to climate change mitigation and healthy construction methods.

          Learn More
        • Properties & Applications

          Metal Resources

          Manufacturing, properties, and applications of architectural metals.

          See Resources
        • Perspectives from Zahner

          Articles

          Project deep-dives, patination science, and other writings from the Zahner team.

          Read the Latest
        • R&D

          R&D
        • Sustainability

          Sustainability
        • Metal Resources

          Metal Resources
        • Articles

          Articles
  • About
        • Our Firm

          Company

          Explore Zahner's history and over 120 years of expertise.

          Learn More
        • Work With Us

          Careers

          See open positions and learn more about our culture.

          Join The Team
        • In the News

          Press

          Zahner projects and coverage in the local and national news.

          View the List
        • What We’re Up To

          News

          Project updates, events, talks, and more.

          See the Latest
        • Our Firm

          Company
        • Work With Us

          Careers
        • In the News

          Press
        • What We’re Up To

          News
  • Contact
    • Twitter
    • Facebook
    • Instagram
    • Pinterest
    • LinkedIn
  • Search

Scottsdale Civic Center

January 10, 2025/in Exterior Architecture Civic, Performance Center Scottsdsale--Arizona Dig-- Studio, Lake|Flato White M 2023 /by Alexandra Contreras

Lake|Flato and Dig Studio collaborated with the City of Scottsdale to transform the Civic Center into a vibrant, family-friendly green space and premier event destination in Scottsdale’s Historic Old Town. Zahner provided engineering, fabrication, and installation expertise for key architectural elements, enhancing the park’s artistic and structural identity.

Surrounded by significant cultural and civic institutions, the Civic Center’s design connects the city, the arts, and the community in a unified space. The Civic Center features multiple pavilions, including a new multifunctional 360-degree event structure. These purposefully designed spaces come together to create a cohesive and welcoming environment.

Aerial view of the Scottsdale Civic Center.

Aerial view of the Scottsdale Civic Center.

Aerial view of the Scottsdale Civic Center.

Aerial view of the Scottsdale Civic Center.

Lighting emphasizes the sculptural qualities of the pavilions at night.

Lighting emphasizes the sculptural qualities of the pavilions at night.

The perforations in the pavilions create dappled shade.

The perforations in the pavilions create dappled shade.

Eaves made of the same panel material as the pavilions creates an cohesive aesthetic.

Eaves made of the same panel material as the pavilions creates an cohesive aesthetic.

Detail view of the pavilion structure during the day.

Detail view of the pavilion structure during the day.

Detail view of one of the pavilions at night.

Detail view of one of the pavilions at night.

Aerial view of the multifunction event space.

Aerial view of the multifunction event space.

https://www.azahner.com/wp-content/uploads/2025/01/Willmeng_Civic_Center_06.10.230010_mono.jpg 1875 2500 Alexandra Contreras https://www.azahner.com/wp-content/uploads/2020/05/logo.svg Alexandra Contreras2025-01-10 10:37:582025-05-12 10:38:44Scottsdale Civic Center

Grand Foyer in the Ambassador Building at Embassy Gardens

July 23, 2024/in Art & Sculpture Hospitality, Sculpture London--England Luis Bustamante Jan Hendrix White M 2016 /by Katie Barone

Located in London’s Nine Elms cultural district, the Embassy Gardens residential and commercial development features an award-winning lobby in the Ambassador Building across from the US Embassy.

Zahner collaborated with Luis Bustamante on the stunning lobby design which also features an art wall design by Jan Hendrix, illuminated by Gia Equation. Zahner crafted waterjet-cut aluminum panels, using 12mm recycled aluminum, with a white powder coating.

The panels feature a unique v-cut fold, giving a sculptural edge without welds, showcasing Zahner’s advanced machining technology. This seamless design enhances the forest canopy image as studied and designed by Hendrix. The project exemplifies innovative collaboration and sustainability, with all cut-out material recycled and the artwork designed for future recyclability.

Interior art wall featured within the lobby of the Embassy Gardens in London.

Interior art wall featured within the lobby of the Embassy Gardens in London.

PHOTO © A. ZAHNER COMPANY.
Close up of interior art wall featured in the Embassy Gardens. The image depicts a forest canopy.

Close up of interior art wall featured in the Embassy Gardens. The image depicts a forest canopy.

PHOTO © A. ZAHNER COMPANY.
Detailed side view of interior art wall.

Detailed side view of interior art wall.

PHOTO © A. ZAHNER COMPANY.
Detail of the panels' v-cut, miter-like folded corners.

Detail of the panels' v-cut, miter-like folded corners.

PHOTO © A. ZAHNER COMPANY.
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2024/07/23122736/Embassy-Gardens-2_edit2_min-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1234 1849 Katie Barone https://www.azahner.com/wp-content/uploads/2020/05/logo.svg Katie Barone2024-07-23 12:27:562024-11-13 10:25:39Grand Foyer in the Ambassador Building at Embassy Gardens

Mount Sinai Medical Center Parking Garage

May 1, 2024/in Exterior Architecture Parking Garage Miami--Florida Netta Architects Thom Faulders Studio White L 2024 /by Katie Barone

Zahner’s latest collaboration with facade designer Faulders Studio and KVC Constructors has produced the stunning Mount Sinai Medical Center Parking Garage Facade in Miami Beach, Florida. The 6-story, 929-automobile Employee Parking Garage is enveloped by a nearly 27,000 sq ft facade that covers three elevations of the parking structure, conceptualized by Netta Architects.

Positioned near the bustling Julia Tuttle Expressway, the facade’s sweeping contours echo the continuous flow of passing vehicles and the soothing waters of Biscayne Bay. The facade’s design blends broad horizontal lines with dynamic geometric contours, accentuated by a series of projected fins that create shadows throughout the day and provide a sense of movement. This visually arresting pattern complements and enhances the architectural landscape of the Mount Sinai Medical Center campus.

The facade’s design is not only aesthetically pleasing but also functional, allowing natural ventilation and daylight penetration. The structure maintains a balance between its functional role and its architectural presence, aiming to support and supplement the other medical buildings nearby.

Facade lighting at night on Mount Sinai Medical Center Parking Garage in Miami Beach, Florida

Facade lighting at night on Mount Sinai Medical Center Parking Garage in Miami Beach, Florida

Photography courtesy of Miami In Focus, Inc. – Peter Leifer, Cheryl Stieffel
Mount Sinai Medical Center Parking Garage Facade in Miami Beach, Florida

Mount Sinai Medical Center Parking Garage Facade in Miami Beach, Florida

Photography courtesy of Miami In Focus, Inc. – Peter Leifer, Cheryl Stieffel

Mount Sinai's Parking Garage allows for natural ventilation and daylight penetration

Mount Sinai's Parking Garage allows for natural ventilation and daylight penetration

Photography courtesy of Miami In Focus, Inc. – Peter Leifer, Cheryl Stieffel
Detail view of facade mounting hardware on Mount Sinai's Parking Garage

Detail view of facade mounting hardware on Mount Sinai's Parking Garage

Photography courtesy of Miami In Focus, Inc. – Peter Leifer, Cheryl Stieffel
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2024/04/30115518/MSG_EAD_0144-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1530 2500 Katie Barone https://www.azahner.com/wp-content/uploads/2020/05/logo.svg Katie Barone2024-05-01 17:04:332025-05-05 08:08:53Mount Sinai Medical Center Parking Garage

Preservation Plaza

February 9, 2023/in Art & Sculpture, Exterior Architecture Performance Center, Public Art, Sculpture Arnolds Park--Iowa RDG Planning & Design Silver, White M 2022 /by Jeneane Dunlap

The Preservation Plaza Stage offers a one-of-a-kind concert setting with the backdrop of West Lake Okoboji’s blue waters glistening in the background. The desire by the Historic Arnolds Park Incorporation (HAPI) and RDG Planning & Design to transform the area into a permanent event space has been realized from what was previously a green space frequented by lake goers for events.

Through a Zahner Assist engagement, Zahner worked with RDG to develop and refine the 6,400 square foot amphitheater that resembles the lake waves above and wooden boat hulls below. Nestled within the structural steel bays are Zahner’s patented aluminum ZEPPS. The structure finishes out with custom finished stainless steel flat seamroof panels, painted aluminum perimeter fascia, and columns covers.

Incorporated within Zahner’s work is the phenolic soffit system underneath which required intricate coordination with the provider. Apart from the structural steel and phenolic system, Zahner self-performed the installation over the course of six months and the project was completed in September of 2022. The Preservation Plaza Stage offers yet another unique experience to the charm and delight of the area and serves as a cornerstone anchoring the park for enjoyment by future generations.

The Preservation Plaza Stage in Arnolds Park, Iowa.

The Preservation Plaza Stage in Arnolds Park, Iowa.

PHOTO © A. ZAHNER COMPANY.

The preservation plaza creates a permanent event space within Arnolds park.

The preservation plaza creates a permanent event space within Arnolds park.

PHOTO © A. ZAHNER COMPANY.
THE PRESERVATION PLAZA STAGE IN ARNOLDS PARK, IOWA.

THE PRESERVATION PLAZA STAGE IN ARNOLDS PARK, IOWA.

PHOTO © A. ZAHNER COMPANY.
THE PRESERVATION PLAZA STAGE IN ARNOLDS PARK, IOWA.

THE PRESERVATION PLAZA STAGE IN ARNOLDS PARK, IOWA.

PHOTO © A. ZAHNER COMPANY.

Mockup stainless steel skins were created to determine the best finish

Stainless steel skin mockup for THE PRESERVATION PLAZA.

Stainless steel skin mockup for THE PRESERVATION PLAZA.

PHOTO © A. ZAHNER COMPANY.
Custom finished stainless steel skins.

Custom finished stainless steel skins.

PHOTO © A. ZAHNER COMPANY.
PHOTO © A. ZAHNER COMPANY.
PHOTO © A. ZAHNER COMPANY.

The Preservation Plaza Stage lights up the night

The Preservation Plaza Stage offers a one-of-a-kind concert setting.

The Preservation Plaza Stage offers a one-of-a-kind concert setting.

PHOTO © A. ZAHNER COMPANY.
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/02/03160754/Preservation-hero-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1333 2000 Jeneane Dunlap https://www.azahner.com/wp-content/uploads/2020/05/logo.svg Jeneane Dunlap2023-02-09 13:13:342023-09-05 16:45:09Preservation Plaza

Paradise Plaza

December 29, 2021/in Exterior Architecture Retail & Commerce Miami--Florida FreelandBuck, Johnston Marklee, SB Architects Blue, Silver, White L 2018 /by dsegard

Paradise Plaza at the Miami Design District

Paradise Plaza is a one-of-a-kind venue in the Miami Design District, which can be easily transformed for any occasion or event. The space features modern, colorful architecture with floor-to-ceiling windows that look out at incredible views of the District and the Museum Garage.

Zahner provided design assist (through our Zahner Assist service), which included collaboration with the ownership team at Dacra and the architects of record at SB Architects, as well as design engineering for the individual design architects, FreelandBuck and Johnston Marklee.

Zahner fabricated and installed the painted aluminum soffits, wall panels, fascia, and column wraps, as well as the stainless steel custom column wraps and pedestrian bridge cladding, which feature Zahner’s Angel Hair® finish and both blue and silver mirror-polished stainless trim.

Painted aluminum soffits, wall panels, and fascia were designed by architects at FreelandBuck Design.

Painted aluminum soffits, wall panels, and fascia were designed by architects at FreelandBuck Design.

Photo by Chris Wells, ARKO | © A. Zahner Company

FreelandBuck Design

To create the surface geometry of the custom soffit, designed by FreelandBuck architects, Zahner engineers utilized a modified, more detailed version of our ZEPPS™ technology. This panel system also continues onto the space’s adjacent fascia, walls, and supporting columns.

View of the soffit and wall panel systems.

View of the soffit and wall panel systems.

Photo by Chris Wells, ARKO | © A. Zahner Company

The undulating geometric surface of the soffit system was created with Zahner's ZEPPS (Zahner Engineered Profile Panel System) technology.

The undulating geometric surface of the soffit system was created with Zahner's ZEPPS (Zahner Engineered Profile Panel System) technology.

Photo by Chris Wells, ARKO | © A. Zahner Company
View of the soffit system and wall panel systems (painted aluminum), trim (silver mirror-polished stainless trim), and column covers (Zahner Angel Hair stainless steel and blue stainless steel).

View of the soffit system and wall panel systems (painted aluminum), trim (silver mirror-polished stainless trim), and column covers (Zahner Angel Hair stainless steel and blue stainless steel).

Photo by Chris Wells, ARKO | © A. Zahner Company
Silver mirror-polished stainless trim connects the FreelandBuck and Johnston Marklee designs.

Silver mirror-polished stainless trim connects the FreelandBuck and Johnston Marklee designs.

Photo by Chris Wells, ARKO | © A. Zahner Company
The triangular design motif that is rendered through painted aluminum on the soffit system continues into the wall system, which is rendered via perforated metal wall panels.

The triangular design motif that is rendered through painted aluminum on the soffit system continues into the wall system, which is rendered via perforated metal wall panels.

Photo by Chris Wells, ARKO | © A. Zahner Company
View of the soffit and wall systems near the escalators on the second floor.

View of the soffit and wall systems near the escalators on the second floor.

Photo by Chris Wells, ARKO | © A. Zahner Company
View of the soffit and wall systems near the elevators on the second floor.

View of the soffit and wall systems near the elevators on the second floor.

Photo by Chris Wells, ARKO | © A. Zahner Company
Close-up view of the Zahner-fabricated and installed wall cladding.

Close-up view of the Zahner-fabricated and installed wall cladding.

Photo by Chris Wells, ARKO | © A. Zahner Company

Johston Marklee Design

The stainless steel custom column covers and pedestrian bridge cladding were both designed by Johnston Marklee architects. The column covers achieve the appearance of selective polish across the surface through the combination of separate parts assembled together, each featuring a different finish: Zahner Angel Hair, mirror stainless on the face, and blue mirror-polished on the inside edges.

The Johnston Marklee design features silver mirror-polish stainless steel trim, Zahner Angel Hair cladding, and blue stainless steel window trim.

The Johnston Marklee design features silver mirror-polish stainless steel trim, Zahner Angel Hair cladding, and blue stainless steel window trim.

Photo by Chris Wells, ARKO | © A. Zahner Company

The mirror-polish stainless steel trim reflects the sky, echoing the blue stainless steel of the window trim.

The mirror-polish stainless steel trim reflects the sky, echoing the blue stainless steel of the window trim.

Photo by Chris Wells, ARKO | © A. Zahner Company
Detail view of the mirror-polish stainless steel trim, Angel Hair cladding, and blue stainless window trim.

Detail view of the mirror-polish stainless steel trim, Angel Hair cladding, and blue stainless window trim.

Photo by Chris Wells, ARKO | © A. Zahner Company
Detail view of the Johnston Marklee design.

Detail view of the Johnston Marklee design.

Photo by Chris Wells, ARKO | © A. Zahner Company
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2021/12/13195523/paradise-plaza-c-chris-wells-arko-9827-grad-min.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1666 2500 dsegard https://www.azahner.com/wp-content/uploads/2020/05/logo.svg dsegard2021-12-29 14:48:592025-05-05 08:12:02Paradise Plaza

Suzanne and Walter Scott Aquarium

November 1, 2021/in Exterior Architecture Entertainment, Renovation, Sculpture, Zoo Omaha--Nebraska Smith Bourne & Associates Blue, Green, Grey, Orange, Silver, White M 2019 Featured /by dsegard

Suzanne and Walter Scott Aquarium at Omaha’s Henry Doorly Zoo

Originally built in 1995, renovations for the Suzanne and Walter Scott Aquarium at the Omaha Zoo were completed in May 2020, featuring a redesigned facade, an updated outdoor cafeteria area, and new entrance features to the aquarium and aquarium conference center. As our third project in the Omaha metro area, Zahner provided various new design elements for this renovation, including the stainless steel wave facade on top of the building, the custom-cut metal coral features and column covers, the dimpled blue stainless steel cladding around the café, and the milled sea creatures that adorn the walls surrounding the space.

Completed Sea Turtle Cafe at the Suzanne and Walter Scott Aquarium.

Completed Sea Turtle Cafe at the Suzanne and Walter Scott Aquarium.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company
Completed entrance sign for the aquarium, fabricated utilizing Zahner's ZEPPS system.

Completed entrance sign for the aquarium, fabricated utilizing Zahner's ZEPPS system.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company
Suzanne and Walter Scott Aquarium exterior and Sea Turtle Cafe at Omaha's Henry Doorly Zoo at sunset.

Suzanne and Walter Scott Aquarium exterior and Sea Turtle Cafe at Omaha's Henry Doorly Zoo at sunset.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company

Zahner was brought on early in the concept development stage to provide Design Assist, which allowed us to work closely with the project team to refine the design intent, provide guidance on materials and finishes, and construct a comprehensive mockup for review before the project went into full fabrication. Due to this collaboration, there were zero change orders on the scope, and installation ran smoothly in cooperation with the contractor and the other trades’ schedules.

Original sketch for the Suzanne and Walter Scott Aquarium facade, by Mark Bourne.

Original sketch for the Suzanne and Walter Scott Aquarium facade, by Mark Bourne.

Photo courtesy of Henry Doorly Zoo
Visual mockup for the Suzanne and Walter Scott Aquarium facade, assembled in Zahner's Kansas City facility.

Visual mockup for the Suzanne and Walter Scott Aquarium facade, assembled in Zahner's Kansas City facility.

© A. Zahner Company
Night viewing of the mockup for the Suzanne and Walter Scott Aquarium facade.

Night viewing of the mockup for the Suzanne and Walter Scott Aquarium facade.

© A. Zahner Company

The freeform wave facade that sits atop the Sea Turtle Café was fabricated using Zahner’s ZEPPS™ technology, which combined the framing structure and the exterior skin into a complete curvilinear system. The individual wave units were pre-fabricated in our shop and shipped to the job site, where Zahner field technicians installed the full facade.

Zahner field workers install the wave facade on top of the Suzanne and Walter Scott Aquarium.

Zahner field workers install the wave facade on top of the Suzanne and Walter Scott Aquarium.

PHOTO © A. ZAHNER COMPANY
Profile of the completed wave facade on top of the Sea Turtle Cafe at Omaha's Henry Doorly Zoo.

Profile of the completed wave facade on top of the Sea Turtle Cafe at Omaha's Henry Doorly Zoo.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company
The face of the waves features a custom etched pattern that provides a reflective, rippling water effect.

The face of the waves features a custom etched pattern that provides a reflective, rippling water effect.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company
View of the Sea Turtle Cafe outdoor space at sunset with lighting.

View of the Sea Turtle Cafe outdoor space at sunset with lighting.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company
Various multi-color lighting systems were incorporated into the design to emphasize the aquatic theme at night.

Various multi-color lighting systems were incorporated into the design to emphasize the aquatic theme at night.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company

Decorative painted aluminum coral features adorn the edges of the café’s canopy and wrap the supporting columns. These were cut on our water jet before they were hand-rolled to the correct radius.


Custom-embossed blue stainless steel clads the walls of the Sea Turtle Café and mimics the look of rippling water. Zahner fabricated a custom die to create this seemingly random emboss pattern. This feature is further highlighted by the lighting throughout the space, creating a fully immersive experience for visitors.


Zahner also provided the various metal sea creatures that decorate the walls of the café and the entrance sign. Each sea creature was individually milled out of aluminum on our CNC equipment.

The dual-layered coral feaures were waterjet cut out of aluminum to clad the edge of the canopy.

The dual-layered coral feaures were waterjet cut out of aluminum to clad the edge of the canopy.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company

Custom rippled blue stainless steel clads the ceiling of the outdoor cafe to create an underwater feel to the space.

Custom rippled blue stainless steel clads the ceiling of the outdoor cafe to create an underwater feel to the space.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company

Custom milled sea turtles and starfish against the rippled blue stainless steel cladding.

Custom milled sea turtles and starfish against the rippled blue stainless steel cladding.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company
Zahner millled out several different sea creatures to decorate the walls of the cafe, including sharks, jellyfish, turtles, stingrays, and starfish.

Zahner millled out several different sea creatures to decorate the walls of the cafe, including sharks, jellyfish, turtles, stingrays, and starfish.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company
All elements of Zahner's scope are further emphasized at night time.

All elements of Zahner's scope are further emphasized at night time.

Photo by Alexandra Hoffman, ARKO | © A. Zahner Company
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2021/11/04095716/omaha-aquarium-c-alexandra-hoffman-arko-3585-gradient.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1920 2880 dsegard https://www.azahner.com/wp-content/uploads/2020/05/logo.svg dsegard2021-11-01 16:15:442022-07-05 16:12:57Suzanne and Walter Scott Aquarium

SoFi Stadium

June 11, 2021/in Exterior Architecture Arena & Stadium, Entertainment, Performance Center Inglewood--California HKS Silver, White XL 2020 Homepage Featured /by dsegard

SoFi Stadium is a sports and entertainment destination built in Inglewood, CA. Referred to as “unprecedented and unparalleled,” SoFi Stadium is the indoor/outdoor home of the Los Angeles Chargers and the Los Angeles Rams. SoFi will host a variety of events year-round, including Super Bowl LVI, the 2023 College Football Championship Game, and the 2028 Opening and Closing Ceremonies of the Olympic Games.

Designed by HKS, the 70,000-seat stadium also has a 6,000-seat venue and a 2.5-acre plaza, all of which are covered by a canopy of translucent ETFE membrane and 34,789 unique panels both in perforation and shape. Zahner’s expertise in perforated imagery (ImageWall®) was put to the test by HKS LINE and their image discretization algorithms/software. The panels were then manufactured by Zahner using a mass customization process developed in coordination with the architect.

THE INDEPENDENTLY-SUPPORTED CANOPY ALLOWS FOR WIND CIRCULATION, PROVIDES DIFFUSED LIGHTING, AND PROTECTS EVENT-GOERS FROM WEATHER.

HKS designed a unique canopy and skin for SoFi Stadium featuring custom-perforated anodized aluminum panels from Zahner.

PHOTO © NIC LEHOUX
ZAHNER PRODUCED 512 PANELS PER WEEK, OVER 67 WEEKS TO BE DELIVERED ON-SITE AND INSTALLED.

ZAHNER PRODUCED 512 PANELS PER WEEK, OVER 67 WEEKS TO BE DELIVERED ON-SITE AND INSTALLED.

PHOTO © NIC LEHOUX

Zahner was brought on board to provide Zahner Assist, which allowed the architect to prove out their design and materials. As a result of the design team’s satisfaction, Zahner was ultimately chosen to furnish the outer shell scope of the stadium.

Drone view of the Frost White anodized aluminum front soffit of SoFi Stadium.

Drone view of the Frost White anodized aluminum front soffit of SoFi Stadium.

Photo by Jesse Pacheco, ARKO | © A Zahner Company

Drone Video

Custom Frost White Anodized Aluminum

During the Zahner Assist phase, Zahner was asked to develop an anodized finish with a white tint for the project, which did not exist in the market at that time. Using Zahner’s expertise in metallurgy, the Frost White anodized finish was developed specifically for SoFi Stadium. Due to its weight and strength, aluminum has a great benefit in many architectural applications. This finish was also applied to the 16 feet-long leading edge fascia of the canopy, which Zahner fabricated and supplied.

Closeup of Frost White anodized aluminum triskin panels.

Closeup of Frost White anodized aluminum triskin panels.

© A Zahner Company
The unique Frost White anodized finish on 1/8 inch thick aluminum panels has never been used before in any other project.

The unique Frost White anodized finish on 1/8 inch thick aluminum panels has never been used before in any other project.

Photo by Jesse Pacheco, ARKO | © A Zahner Company
Drone view of the Frost White anodized aluminum front soffit of SoFi Stadium.

Drone view of the Frost White anodized aluminum front soffit of SoFi Stadium.

Photo by Jesse Pacheco, ARKO | © A Zahner Company

Mass Customization Through Digital Fabrication

Together with HKS, Zahner created a parametric design-to-fabrication workflow that streamlined production activities from the design model to the fabrication machine. On SoFi Stadium the promise of mass customization (part variation without additional cost) was realized through novel software automation and atypical project delivery methods.

A key to the production process was the transfer of design intent from the architect to Zahner. Instead of creating individual panel drawings (labor intensive to make and review), the architect provided ‘encoded’ text files with design intent for each unique panel. Zahner developed an automation script that automatically read each text file, nested each panel, and applied part specific fabrication parameters.

By virtue of this analysis, we were able to generate machine instructions directly from the design model, removing laborious tasks that traditionally add cost but not value. Ultimately this streamlined, collaborative process led to a drastic cut in the programming time for each panel from an unacceptable 15 min to an impressive 7 seconds per panel, managing the volume of unique panels efficiently and affordably.

Graphic showing the typical CNC fabrication method of one program producing 1000x parts.

Graphic showing the typical CNC fabrication method of one program producing 1000x parts.

© A Zahner Company
Graphic showing Zahner's challenge of 10,000x programs producing one unique part per program.

Graphic showing Zahner's challenge of 10,000x programs producing one unique part per program.

© A Zahner Company

This process fluidity is not typical in traditional production workflows where design and engineering tools are siloed from manufacturing tools. Here we wielded a computational dexterity common in the design/engineering software further downstream within the manufacturing process. The workflow allowed us to embed fabrication and sequence information directly into the CAD model during the design and engineering phase.

Included in the embedded information was an inscribed “dot code” on each panel, trackable via a custom app through the fabrication, shipping, and installation processes. This was a critical part of fabricating and shipping all 34,789 unique triskins under an expedited project schedule. Using this improved process, communication between architect, engineer, fabricator, and installer was seamless and the team was able to respond to project changes without incurring extra costs.

Project Timeline showing the reduction of computation and the growth of costs as a project progresses.

Project Timeline showing the reduction of computation and the growth of costs as a project progresses.

© A Zahner Company
Single panel design with fabrication details and instructions.

Single panel design with fabrication details and instructions.

© A Zahner Company
Closeup of panel design details.

Closeup of panel design details.

© A Zahner Company
Closeup of the inscribed "dot code" used to track the panel through the fabrication, shipping, and installation processes.

Closeup of the inscribed "dot code" used to track the panel through the fabrication, shipping, and installation processes.

© A Zahner Company

Fabrication Process

The panels attach to a steel space frame, which attaches to the steel superstructure surrounding the stadium; along with the roof, this makes up the canopy. The independently supported canopy (separate from the stadium bowl structure) covers the stadium, allowing for wind circulation, diffused lighting, and protection from the elements.

Custom tooling was designed by Zahner for creating the softened edges around the perforations.

Custom tooling was designed by Zahner for creating the softened edges around the perforations.

© A Zahner Company
Underside of the support structure that forms the SoFi Stadium canopy.

Underside of the support structure that forms the SoFi Stadium canopy.

© A Zahner Company
The triangular panels attach to a support system, which attaches to the steel structure surrounding the stadium.

The triangular panels attach to a support system, which attaches to the steel structure surrounding the stadium.

© A Zahner Company
Pre-fabricated mega panel being installed into place on-site.

Pre-fabricated mega panel being installed into place on-site.

© A Zahner Company
Zahner worker on site for the construction of SoFi Stadium.

Zahner worker on site for the construction of SoFi Stadium.

© A Zahner Company
Underside of the support structure that forms the SoFi Stadium canopy.

Underside of the support structure that forms the SoFi Stadium canopy.

PHOTO © NIC LEHOUX
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2021/06/09110833/821.024-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1875 2500 dsegard https://www.azahner.com/wp-content/uploads/2020/05/logo.svg dsegard2021-06-11 14:01:332025-05-05 08:29:02SoFi Stadium

Wynwood Garage

March 5, 2021/in Exterior Architecture Parking Structure Miami--Florida Faulders Studio White L 2018 /by dsegard

The Wynwood Garage is a transformational mixed-use project that offers approximately 20,500 square feet of retail space, 428 parking spaces and 30,000 square feet of creative office space. The garage is also the first structured parking facility in Wynwood, at the center of the district.


The painted aluminum facade, designed by Faulders Studio, merges artistic unpredictability with the edgy neighborhood context and seamlessly blends the public benefit of parking with the commercial demands of Wynwood. According to Thom Faulders, “The facade and its shape-shifting patterns are “mega-subtle.” The perforated planes create multiple sight-lines that cascade around and envelop the structure in a way that is both highly specific and subdued. The wall is also designed to allow for additional artwork to be hung on the facade.

Custom perforated painted aluminum screen engineered and fabricated by Zahner.

Custom perforated painted aluminum screen engineered and fabricated by Zahner.

Photo by Tex Jernigan, ARKO | © A Zahner Company

Custom perforated painted aluminum screen engineered and fabricated by Zahner.

Custom perforated painted aluminum screen engineered and fabricated by Zahner.

Photo by Tex Jernigan, ARKO | © A Zahner Company
ZAHNER ENGINEERED AND FABRICATED OVER 54,000 SQUARE FEET OF FACADE PANELS.

ZAHNER ENGINEERED AND FABRICATED OVER 54,000 SQUARE FEET OF FACADE PANELS.

Photo by Tex Jernigan, ARKO | © A Zahner Company

The facade itself is constructed of a series of 1/8″ thick aluminum Drop & Lock panels, mounted to black painted aluminum mullions. A series of projected fin-like elements are mounted to the panels to provide depth to the design. The rounded corners appear to be free floating and utilize hot-dipped galvanized steel shapes to mount the mullions. These support points were design, fabricated and installed by Zahner.


Zahner was brought on to the project team early in the schematic design phase by Goldman Properties and Thom Faulders to develop his unique vison for the site in the Wynwood section of Miami. Zahner worked closely with the team, including the contractor, KVC Constructors, to design with the established budget in mind. This Zahner Assist approach yielded a series of tabletop mock-ups, and ultimately a large prototype, complete with the integrated lighting, was fabricated and installed at the Kansas City facility.

THE WALL IS DESIGNED TO ALLOW FOR ADDITIONAL ARTWORK TO BE HUNG ON THE FAÇADE.

THE WALL IS DESIGNED TO ALLOW FOR ADDITIONAL ARTWORK TO BE HUNG ON THE FACADE.

Photo by Tex Jernigan, ARKO | © A Zahner Company
Mockup created by Zahner with integrated lighting, fabricated and installed at the Kansas City facility.

Mockup created by Zahner with integrated lighting, fabricated and installed at the Kansas City facility.

© A. Zahner Company
Mockup created by Zahner through Zahner Assist process

Mockup created by Zahner through Zahner Assist process

© A. Zahner Company

Through Zahner Assist, we deliver enhanced value to the Design Assist phase by making it easier for owners, contractors, architects, and fabricators to communicate and work together towards project success. We have the experience and engineering capabilities all under one roof to develop system details, project budgets, and engineering specifications that create a general framework that the construction team can easily follow throughout the fabrication and installation phases.

Final installation of Zahner panels

Final installation of Zahner panels

Photo by Tex Jernigan, ARKO | © A Zahner Company
Final installation of Zahner panels

Final installation of Zahner panels

Photo by Tex Jernigan, ARKO | © A Zahner Company
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2021/03/10152158/wynwood-garage-arko-3403-2.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1702 2880 dsegard https://www.azahner.com/wp-content/uploads/2020/05/logo.svg dsegard2021-03-05 14:11:372025-03-12 09:50:10Wynwood Garage

Kravis Bench

July 25, 2020/in Art & Sculpture Public Art West Palm Beach--Florida Robin Oglesbee-Venghaus Fuschia, White M 2019 /by Winifred Wright

Kravis Bench; West Palm Beach, Florida

Located in West Palm Beach, Florida, the Kravis Center for the Performing Arts commissioned artist Robin Oglesbee-Venghaus to design, build and deliver a sculptural entrance setting. He collaborated with Zahner to develop an elegant solution for his composition entitled “The Embrace.”

Zahner designed and engineered the benches which were comprised of individual elements fastened together to form a dynamic bench—forms which use painted aluminum segments to form two 27 foot long curving benches. The bench heights are exaggerated for dramatic effect and taper in counterpoint to each other. The back side of the benches are clad in a translucent LG solid surface and are illuminated by continuous programmable LED fixtures.

Facade for 178 North Eleventh with antique copper patina in Brooklyn, New York.

Photo by Curtis Smith | ARKO​

Photo by Curtis Smith | ARKO​

Facade for 178 North Eleventh with antique copper patina in Brooklyn, New York.

Photo by Curtis Smith | ARKO​

Photo by Curtis Smith | ARKO​

Facade for 178 North Eleventh with antique copper patina in Brooklyn, New York.

Photo by Curtis Smith | ARKO​

Photo by Curtis Smith | ARKO​

Facade for 178 North Eleventh with antique copper patina in Brooklyn, New York.

Photo by Curtis Smith | ARKO​

Photo by Curtis Smith | ARKO​

Facade for 178 North Eleventh with antique copper patina in Brooklyn, New York.

Photo by Curtis Smith | ARKO​

Photo by Curtis Smith | ARKO​

https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/07/23153303/kravis-bench-photo-curtis-smith-arko-7065-bw.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1666 2500 Winifred Wright https://www.azahner.com/wp-content/uploads/2020/05/logo.svg Winifred Wright2020-07-25 17:30:542021-04-12 14:46:02Kravis Bench

Turbulence House

February 1, 2017/in Exterior Architecture Residential Abiquiu--New Mexico, Vicenza--Italy Steven Holl Architects White S 2002, 2005 /by cmorris

An Artistic Guesthouse

Designed by Steven Holl Architects and manufactured using Zahner form-building technologies, Turbulence House functions as a guest home for artists Richard Tuttle and Mei-Mei Berssenbrugge.

Steven Holl likens the design to “the tip of an iceberg indicating a much larger mass below. The form allows turbulent wind to blow through its center.” The stressed skin and aluminum rib construction was digitally prefabricated in Kansas City and assembled on site in Abiquiu, New Mexico.

Related System

Turbulence House

A single ZEPPS Assembly for the Turbulence House is raised for installation.

A SINGLE ZEPPS ASSEMBLY FOR THE TURBULENCE HOUSE IS RAISED FOR INSTALLATION.

PHOTO © A. ZAHNER COMPANY.

Building the Curved Form

The architect initially provided Zahner with a small-scale physical model. Using 3D scanning capabilities, the team developed a digital model in CAD system Pro Engineer. (Today, the company uses a more sophisticated 3DEXPERIENCE platform.)

Zahner engineers used this model to refine the form into ZEPPS assemblies, the Zahner system for building sculptural forms. Typically, the ZEPPS system exists as a secondary structure to a structural steel primary support. For Turbulence House, the ZEPPS assemblies serve as the primary structure, which required additional engineering for full integration.

A total of 31 pre-fabricated metal assemblies, each with a unique shape, form the “shell” of the house. Galvalume, an alloy of zinc and aluminum, was used to create the building skin.

A second version of Turbulence House was installed indoors during an exhibition at the Basilica Palladiana in Vicenza, Italy. It is now permanently displayed on the grounds of a private company in northeastern Italy.

Steven Holl watercolor painting of the Turbulence House.

Steven Holl watercolor painting of the Turbulence House.

Photo © Steven Holl.

Physical model by Steven Holl Architects for the Turbulence House.

Physical model by Steven Holl Architects for the Turbulence House.

Drawings of the Turbulence House.

Drawings of the Turbulence House.

Photos © Steven Holl Architects.

None
None
None
None
None
None
3D Model of the scanned physical model for Turbulence House.

3D Model of the scanned physical model for Turbulence House.

Image © A. Zahner Company.

ZEPPS conversion of the model, color-coded into individual ZEPPS assemblies.

ZEPPS conversion of the model, color-coded into individual ZEPPS assemblies.

Image © A. Zahner Company.

Turbulence House with partial cladding installed.

Turbulence House with partial cladding installed.

Internal rib system prior to drywall.

Internal rib system prior to drywall.

Interior of the Turbulence Residence.

Interior of the Turbulence Residence.

Photograph courtesy Steven Holl Architects.

None
None
None
A section of the ZEPPS is lifted into the Basilica Palladiana in Vicenza, Italy.

A SECTION OF THE ZEPPS IS LIFTED INTO THE BASILICA PALLADIANA IN VICENZA, ITALY.

https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/07/24135605/2_turbulence-house-abiquiu-install-50.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1080 1920 cmorris https://www.azahner.com/wp-content/uploads/2020/05/logo.svg cmorris2017-02-01 15:46:442025-02-20 07:58:30Turbulence House
Page 1 of 3123
Keep up with Zahner

Join our newsletter.

Please read our Privacy Policy for detailed info on how we use and manage data about you: azahner.com/privacy-policy.
Loading
Zahner White
  • Materials
  • Products
  • Custom Solutions
  • R&D
  • Resources
  • Samples
  • Projects
  • Applications
  • Capabilities
  • Profiles
  • Articles
  • Newsletter
  • About
  • News
  • Press
  • Careers
  • Contact
Newsletter
Have a complex project?

Talk to a specialist.

Contact Us

Or find the answer.

FAQ

Recent Projects

Google Bay View campus in Mountain View, California.Photo © Iwan Baan, Courtesy of Heatherwick Studio
Mountain View, CA

Google Bay View Campus

…
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2025/04/23083350/CREDIT_Iwan-Baan_Google-Bay-View-22-04_5816_Iwan-Baan_LR-mono.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1334 2000 Alexandra Contreras https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Alexandra Contreras2025-04-25 10:39:052025-05-05 12:12:26Google Bay View Campus
Council Bluffs, Iowa

James Turrell Skyspace

https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2025/03/24062220/james-turrell-sphere-7-min.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1512 2016 Alexandra Contreras https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Alexandra Contreras2025-03-31 13:46:032025-04-24 11:33:17James Turrell Skyspace
Stanford, California

Schwab Residential Center at Stanford Graduate School of Business

https://www.azahner.com/wp-content/uploads/2025/01/stanford-gsb-art-wall-9497-crop-mono-scaled.jpg 1706 2560 Alexandra Contreras https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Alexandra Contreras2025-01-10 10:40:552025-05-01 23:07:43Schwab Residential Center at Stanford Graduate School of Business
Aerial view of the Scottsdale Civic Center.
Scottsdsale, Arizona

Scottsdale Civic Center

https://www.azahner.com/wp-content/uploads/2025/01/Willmeng_Civic_Center_06.10.230010_mono.jpg 1875 2500 Alexandra Contreras https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Alexandra Contreras2025-01-10 10:37:582025-05-12 10:38:44Scottsdale Civic Center
The perforated panels are made from Zahner's Angel Hair, a diffuse finish on stainless steel.PHOTO ©️ Parrish Ruiz de Velasco (parrch.com)
Arlington, Texas

UT Arlington Cooper Street Bridge

https://www.azahner.com/wp-content/uploads/2025/01/1F2A0383_mono.jpg 1667 2500 Alexandra Contreras https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Alexandra Contreras2025-01-10 10:36:262025-01-10 10:36:26UT Arlington Cooper Street Bridge
London, England

Grand Foyer in the Ambassador Building at Embassy Gardens

https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2024/07/23122736/Embassy-Gardens-2_edit2_min-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1234 1849 Katie Barone https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Katie Barone2024-07-23 12:27:562024-11-13 10:25:39Grand Foyer in the Ambassador Building at Embassy Gardens
Miami, Florida

Mount Sinai Medical Center Parking Garage

https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2024/04/30115518/MSG_EAD_0144-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1530 2500 Katie Barone https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Katie Barone2024-05-01 17:04:332025-05-05 08:08:53Mount Sinai Medical Center Parking Garage
Washington D.C.

1700 Pennsylvania Avenue – The Mills Building

https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2024/03/26092146/2022-09-14_016-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1875 2500 Katie Barone https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Katie Barone2024-03-26 09:23:502024-03-27 16:03:401700 Pennsylvania Avenue – The Mills Building
Kansas City

Pembroke Hill Dining Hall

https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2024/03/26092257/Jan-Hendrix-Pembroke-Mar-2023-2702-Pano-Edit-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1680 2500 Katie Barone https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Katie Barone2024-03-26 09:23:142024-03-26 14:10:40Pembroke Hill Dining Hall
50 Hudson Yards Terrace underneath the canopy.© Fedora Hat Photography
New York City

50 Hudson Yards Terrace

https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/10/24112651/50-hudson-yards-DJI_0604-copyright-fedora-hat-grad-scaled.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1918 2560 Winifred Wright https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Winifred Wright2023-10-31 10:56:562025-03-12 09:45:3350 Hudson Yards Terrace
PreviousNext
1234
Google Bay View campus in Mountain View, California.Photo © Iwan Baan, Courtesy of Heatherwick Studio
Mountain View, CA

Google Bay View Campus

…
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2025/04/23083350/CREDIT_Iwan-Baan_Google-Bay-View-22-04_5816_Iwan-Baan_LR-mono.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1334 2000 Alexandra Contreras https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Alexandra Contreras2025-04-25 10:39:052025-05-05 12:12:26Google Bay View Campus
Council Bluffs, Iowa

James Turrell Skyspace

https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2025/03/24062220/james-turrell-sphere-7-min.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1512 2016 Alexandra Contreras https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Alexandra Contreras2025-03-31 13:46:032025-04-24 11:33:17James Turrell Skyspace
Google Bay View campus in Mountain View, California.Photo © Iwan Baan, Courtesy of Heatherwick Studio
Mountain View, CA

Google Bay View Campus

…
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2025/04/23083350/CREDIT_Iwan-Baan_Google-Bay-View-22-04_5816_Iwan-Baan_LR-mono.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1334 2000 Alexandra Contreras https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Alexandra Contreras2025-04-25 10:39:052025-05-05 12:12:26Google Bay View Campus
Council Bluffs, Iowa

James Turrell Skyspace

https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2025/03/24062220/james-turrell-sphere-7-min.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1512 2016 Alexandra Contreras https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Alexandra Contreras2025-03-31 13:46:032025-04-24 11:33:17James Turrell Skyspace
Stanford, California

Schwab Residential Center at Stanford Graduate School of Business

https://www.azahner.com/wp-content/uploads/2025/01/stanford-gsb-art-wall-9497-crop-mono-scaled.jpg 1706 2560 Alexandra Contreras https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Alexandra Contreras2025-01-10 10:40:552025-05-01 23:07:43Schwab Residential Center at Stanford Graduate School of Business
PreviousNext
123

Latest Updates

Featured

Exploring the Legendary Process and Projects of KPF

…
April 24, 2024
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2024/04/22140203/50-hudson-yards-DJI_0145-copyright-fedora-hat-scaled-crop-grad-min.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1073 2500 Katie Barone https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Katie Barone2024-04-24 09:00:372024-04-22 14:02:26Exploring the Legendary Process and Projects of KPF
TaubmanEXTERIOR PATINATED ZINC SURFACE, ROANO ZINC.
Education

Zinc Guide Part 3: Innovative Zinc Patinas & Finishes, And the World’s Most Interesting Architecture

…
October 4, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/10/04125618/taubman-5608-scaled-1-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1698 2560 Winifred Wright https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Winifred Wright2023-10-04 12:56:422024-01-14 08:43:01Zinc Guide Part 3: Innovative Zinc Patinas & Finishes, And the World’s Most Interesting Architecture
Custom patinated zinc and aluminum panels adorn the parking facade for Children's Hospital Richmond Pavilion.
Education

Open Area Calculations for Perforated Metal Panels & Why They’re Important

…
October 2, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/10/04125520/childrens-hospital-richmond-chorp-copyright-zahner-tex-jernigan-5119-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1600 2400 dsegard https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg dsegard2023-10-02 17:08:522024-06-04 14:53:09Open Area Calculations for Perforated Metal Panels & Why They’re Important
The Hunter Museum, clad in Zahner's preweathered Hunter Zinc.Ɱ, Creative Commons Attribution-Share Alike 4.0 International license, edited.
Education

Zinc Guide Part 2: The Intriguing Attributes, Alloys & Finishes of Zinc

…
September 20, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/09/20123638/Hunter_Museum_bluff-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1406 2500 Winifred Wright https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Winifred Wright2023-09-20 12:33:312023-12-11 17:28:25Zinc Guide Part 2: The Intriguing Attributes, Alloys & Finishes of Zinc
Featured

Exploring the Legendary Process and Projects of KPF

…
April 24, 2024
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2024/04/22140203/50-hudson-yards-DJI_0145-copyright-fedora-hat-scaled-crop-grad-min.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1073 2500 Katie Barone https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Katie Barone2024-04-24 09:00:372024-04-22 14:02:26Exploring the Legendary Process and Projects of KPF
TaubmanEXTERIOR PATINATED ZINC SURFACE, ROANO ZINC.
Education

Zinc Guide Part 3: Innovative Zinc Patinas & Finishes, And the World’s Most Interesting Architecture

…
October 4, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/10/04125618/taubman-5608-scaled-1-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1698 2560 Winifred Wright https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Winifred Wright2023-10-04 12:56:422024-01-14 08:43:01Zinc Guide Part 3: Innovative Zinc Patinas & Finishes, And the World’s Most Interesting Architecture
Custom patinated zinc and aluminum panels adorn the parking facade for Children's Hospital Richmond Pavilion.
Education

Open Area Calculations for Perforated Metal Panels & Why They’re Important

…
October 2, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/10/04125520/childrens-hospital-richmond-chorp-copyright-zahner-tex-jernigan-5119-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1600 2400 dsegard https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg dsegard2023-10-02 17:08:522024-06-04 14:53:09Open Area Calculations for Perforated Metal Panels & Why They’re Important
Featured

Exploring the Legendary Process and Projects of KPF

…
April 24, 2024
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2024/04/22140203/50-hudson-yards-DJI_0145-copyright-fedora-hat-scaled-crop-grad-min.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1073 2500 Katie Barone https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Katie Barone2024-04-24 09:00:372024-04-22 14:02:26Exploring the Legendary Process and Projects of KPF
TaubmanEXTERIOR PATINATED ZINC SURFACE, ROANO ZINC.
Education

Zinc Guide Part 3: Innovative Zinc Patinas & Finishes, And the World’s Most Interesting Architecture

…
October 4, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/10/04125618/taubman-5608-scaled-1-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1698 2560 Winifred Wright https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Winifred Wright2023-10-04 12:56:422024-01-14 08:43:01Zinc Guide Part 3: Innovative Zinc Patinas & Finishes, And the World’s Most Interesting Architecture
Custom patinated zinc and aluminum panels adorn the parking facade for Children's Hospital Richmond Pavilion.
Education

Open Area Calculations for Perforated Metal Panels & Why They’re Important

…
October 2, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/10/04125520/childrens-hospital-richmond-chorp-copyright-zahner-tex-jernigan-5119-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1600 2400 dsegard https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg dsegard2023-10-02 17:08:522024-06-04 14:53:09Open Area Calculations for Perforated Metal Panels & Why They’re Important
The Hunter Museum, clad in Zahner's preweathered Hunter Zinc.Ɱ, Creative Commons Attribution-Share Alike 4.0 International license, edited.
Education

Zinc Guide Part 2: The Intriguing Attributes, Alloys & Finishes of Zinc

…
September 20, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/09/20123638/Hunter_Museum_bluff-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1406 2500 Winifred Wright https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Winifred Wright2023-09-20 12:33:312023-12-11 17:28:25Zinc Guide Part 2: The Intriguing Attributes, Alloys & Finishes of Zinc
12
PreviousNext
Featured

Exploring the Legendary Process and Projects of KPF

…
April 24, 2024
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2024/04/22140203/50-hudson-yards-DJI_0145-copyright-fedora-hat-scaled-crop-grad-min.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1073 2500 Katie Barone https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Katie Barone2024-04-24 09:00:372024-04-22 14:02:26Exploring the Legendary Process and Projects of KPF
TaubmanEXTERIOR PATINATED ZINC SURFACE, ROANO ZINC.
Education

Zinc Guide Part 3: Innovative Zinc Patinas & Finishes, And the World’s Most Interesting Architecture

…
October 4, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/10/04125618/taubman-5608-scaled-1-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1698 2560 Winifred Wright https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Winifred Wright2023-10-04 12:56:422024-01-14 08:43:01Zinc Guide Part 3: Innovative Zinc Patinas & Finishes, And the World’s Most Interesting Architecture
Custom patinated zinc and aluminum panels adorn the parking facade for Children's Hospital Richmond Pavilion.
Education

Open Area Calculations for Perforated Metal Panels & Why They’re Important

…
October 2, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/10/04125520/childrens-hospital-richmond-chorp-copyright-zahner-tex-jernigan-5119-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1600 2400 dsegard https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg dsegard2023-10-02 17:08:522024-06-04 14:53:09Open Area Calculations for Perforated Metal Panels & Why They’re Important
The Hunter Museum, clad in Zahner's preweathered Hunter Zinc.Ɱ, Creative Commons Attribution-Share Alike 4.0 International license, edited.
Education

Zinc Guide Part 2: The Intriguing Attributes, Alloys & Finishes of Zinc

…
September 20, 2023
https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2023/09/20123638/Hunter_Museum_bluff-grad.jpg?strip=all&lossy=1&quality=92&webp=85&ssl=1 1406 2500 Winifred Wright https://e5awgs3wuhi.exactdn.com/wp-content/uploads/2020/05/24152838/logo.svg Winifred Wright2023-09-20 12:33:312023-12-11 17:28:25Zinc Guide Part 2: The Intriguing Attributes, Alloys & Finishes of Zinc
1234
PreviousNext

1400 East 9th Street, Kansas City, MO 64106, USA

  • Twitter
  • Facebook
  • Instagram
  • Pinterest
  • LinkedIn
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

© 2023 A. Zahner Company — All Rights Reserved.

Scroll to top
Portrait of architect Zaha Hadid rendered with Zahner ImageLines

Inspiration Delivered

Cool metal stuff, straight to your inbox

Make your inbox more interesting with inspiring projects, educational resources, and other cool metal stuff.

Please read our Privacy Policy for detailed info on how we use and manage data about you: azahner.com/privacy-policy.